AD/CVD Survey (125 projects / 35 delayed / 57 unchanged)

Over the past two weeks, we surveyed the status of ~125 U.S. utility solar projects that had an original 2022 completion prior to the Department of Commerce AD / CVD announcement in late March. The status of the individual project was assessed based on 1) confirmation with the developer that  the project is on track despite the AD/CVD petition 2) identification of the project as not sourcing panels from the four targeted Southeast Asia countries or 3) verification that the project is in final stages of installation or commissioning (satellite imagery, visual inspection etc). Key takeaways from this survey include:……

Renewable Energy Data Trends To Watch Through Earnings [PDF DOWNLOAD]

In this post, we provide an earnings preview of key themes, catalysts, and data to watch in renewables energy during 4Q21 reporting season… Members are able to download a slide deck with charts and analysis covering Utility Scale Solar, Resi Solar, Storage, and Wind themes.

Utility Solar Update

In this note, we update our U.S. utility scale solar thoughts for November data while also reviewing 2021. Most notable has been a surprising jump in new construction activity despite overwhelming anecdotes regarding higher costs and logistics delays.

Biden’s Solar 40% By 2035 Already Falling Short

In this note, we have taken a look at the recent Biden solar goal of 40% by 2035, including near term guideposts (2021-2025) that are already falling short. THIS REPORT IS AVAILABLE TO ALL LIUM MEMBERS INCLUDING THOSE WITH FREE ACCOUNTS. TO READ EITHER:
A) LOG IN: https://lium.com/?memberful_endpoint=auth
B) REGISTER (FREE): https://lium.memberful.com/register