Skip to content
  • [email protected]
LIUM
  • Power and Renewables
    • Utility-Scale Solar
    • Residential Solar
    • Storage
  • Oil and Gas
    • Shale Services
    • Shale Production
  • About LIUM
    • Our Process
    • Our Team
    • All Sectors
    • Concierge Onboarding
    • Careers
    • Contact
    • Subscription Info
  • Subscription Info
  • Power and Renewables
    • Utility-Scale Solar
    • Residential Solar
    • Storage
  • Oil and Gas
    • Shale Services
    • Shale Production
  • About LIUM
    • Our Process
    • Our Team
    • All Sectors
    • Concierge Onboarding
    • Careers
    • Contact
    • Subscription Info
  • Subscription Info
Sign In
Subscription Info
My Account

Category: Solar Satellite

Pipeline update (approvals get support after 3 down qtrs); TX strong as ever; CAISO/PJM terrible

In this update, we have processed the new interconnection approvals that have been executed over the last three months.

SOLARSAT™: July takes a breather (down 15% from Q2 average)

After a big June and Q2, new utility solar construction took a breather in July posting only ~2.5 GWac compared to ~3 GWac per month since April.

Updating Q2 model / database (2024E unchanged); Tracker backlog @ 9 GWac; Texas grid 10% solar this summer

In this note, we are updating our utility solar database and pipeline.

SOLARSAT™: Record Q2 new construction starts (9.3 GWac); Top 30 finally ramping; Tracker installs flat y/y

During the month, another 16 projects have kicked off, shrugging off potential AD/CVD tariffs and contrary to the solar construction delay narrative.

SOLARSAT™: Another 18 big projects (3 GWac) kicked off in May; Trackers on pace for flattish y/y; SEIA estimates way too low

Despite SEIA claims of a slowdown, persistent delay anecdotes, and tariff fears, actual new solar construction has remained firm.

Pipeline update – new approvals down again; Late stage queue flat at 112 GWac

In this note, we are updating our utility solar database and pipeline.

SOLARSAT™: New construction – no problem; Nextera overweight; Trackers flat; Shoals losing share

U.S. utility-scale solar market is having no problem starting projects.

AD/CVD pockets of risk, but mostly exaggerated

In this note, we summarize our recent data collected surrounding U.S. solar module imports and solar demand as it relates to AD/CVD risk.

Lowering 2024E tracker forecast (now +0-5%); New construction starts on schedule

After seeing the pace of 1Q starts, collecting new permits / interconnections agreements, and reassessing our developer forecast, we are maintaining our new construction forecast at 15-20% in 2024E.

SOLARSAT™: Seasonal uptick continues w/ March new construction @ 2.4 GWac (+15% y/y); Mostly Nextera, others flat; Tracker installations disappoint

Generally speaking, the seasonal uptick is happening with March noticeably higher for both new construction starts and tracker installations.

← Previous
Next →

Contact Information

  • Phone: (512) 504-7407
  • Email: [email protected]
  • Address:
    3800 N Lamar Blvd.
    2nd Fl, Ste. 200
    Austin, TX 78756

Latest Insights

SOLARSAT NOTE TO CLIENTS 071025

UTILITY SCALE SOLAR NOTE TO CLIENTS 062625

© 2022 LIUM | All rights reserved | Privacy Policy | Terms of Service